The planting holes section is questionable, I wouldn’t propose this method at all. A well prepared paddock will have been cultivated 20-30cm deep at least, and any deeper prep would best be done via a rip line, if there has been enough ripping done to ensure its not become a water filled trench.
The planting holes section is questionable, I wouldn’t propose this method at all. A well prepared paddock will have been cultivated 20-30cm deep at least, and any deeper prep would best be done via a rip line, if there has been enough ripping done to ensure its not become a water filled trench.